ºÚ¹Ï³ÔÁÏÍø

Internal

CEM14B - Construction Cost Management: Principles and Practice B

ºÚ¹Ï³ÔÁÏÍø

CEM14B-Construction Cost Management: Principles and Practice B

Module Provider: School of Construction Management and Engineering, School of Built Environment
Number of credits: 20 [10 ECTS credits]
Level:7
Terms in which taught: Autumn / Spring term module
Pre-requisites:
Non-modular pre-requisites:
Co-requisites:
Modules excluded: CEM12B Business of Construction B CEM13B Principles and Practice of Project Management B CEM15B International Development in Construction B CEM16B Renewable Energy Systems B CEM17B Sustainable Design and Management Principles and Practice B CEM11B Collaboration, Practice and Innovation B
Current from: 2023/4

Module Convenor: Dr Florence Phua
Email: f.phua@reading.ac.uk

Type of module:

Summary module description:

This is the key integrating module for the MSc Construction Cost Management programme. It is based on the idea of integrating learning from core programme modules into a personal, coherent view of the discipline of construction management. We will investigate the diverse perspectives that different modules bring to the study of construction management through two continuous pieces of work running in parallel throughout the programme. First, through the use of reflective writing based on observations of practice and lessons from core modules connected to a recognised professional skills framework. Second, the application of learning from core modules to a case study building project. An introduction to Construction Cost Management is provided at the beginning of the programme in the week before the start of the autumn term, primarily for non-cognate students.



Please note that there are three matching module description forms: CEM104, CEM14A and CEM14B. This is because the A and B versions are the flexible-modular equivalent of the full-time version. The flexible-modular equivalent runs over two years. The only difference between full-time and flexible-modular in relation to assessment is that the assignments for the 40-credit version are split across two years for flexible-modular students in two 20-credit versions. The differences in contact hours for these modules relate to the class contact hours.


Aims:

The aim is to explore the changing nature of knowledge and practice in the cost management of construction development projects and the environments in which they are undertaken. These changes bring new opportunities and new challenges for construction cost managers. We seek to apply the lessons from the core modules to a case study project and also to empower students to have ownership of their own professional development through reflective writing. This involvesÌýreflections on translating theory into practice and provides an opportunity for students to understand their own learning.


Assessable learning outcomes:

Students will demonstrate the ability to evaluate different approaches to the cost management of construction development projects and to synthesise knowledge, tools and techniques from the core modules of the programme into a coherent framework for cost management in construction projects. Through the use of reflective writing, students will critique current construction cost management practice and explore the use of reflection in professional development. Students will apply the principles of clear and concise report writing and organisation of written material


Additional outcomes:

The assignments will give students the opportunity to develop skills in time management and problem solving and enhance the student’s ability to work and learn independently. The development of these skills is supported through seminars and tutorials related to the reflective portfolio and to the case study. Assignments and guided reading will enable students to connect inputs from the core modules and form a coherent view of international development in construction with reference to a specific working environment.


Outline content:

The content involves integrating activities designed to draw together the core modules in a way thatÌýis both applied and reflective. This involves continuous study and discussion in seminars encompassing the content of the construction cost management programme and its application. Students are required to use the tools and techniques acquired through the programme to articulate coherent arguments and produce an in-depth account of reflective learning. Over theduration of the programme, students compile a personal portfolio consisting of a series of reflective accounts of specific incidents that provide opportunities for translating theory into practice. They also build up a coherent case study applying their learning from core modules.


Global context:

Construction cost management is related very closely to the place in which development and construction work are carried out. By making clear the specific practices and their contexts, students will understand that construction projects are context-dependent with cost management practice varying significantly around the world.


Brief description of teaching and learning methods:

Lectures, workshops, seminars, case studies, reflective learning and guided reading.


Contact hours:
Ìý Autumn Spring Summer
Tutorials 10 10
Guided independent study: 90 90
Ìý Ìý Ìý Ìý
Total hours by term 100 100
Ìý Ìý Ìý Ìý
Total hours for module 200

Summative Assessment Methods:
Method Percentage
Report 100

Summative assessment- Examinations:

Summative assessment- Coursework and in-class tests:

One integrating case study consisting of questions relating to core modules and one reflective portfolio, both carried out over the duration of the programme with submission after the end of the timetabled modules.


Formative assessment methods:

There will be a range of formative assessment methods embedded within the module delivery.



Principally, the formative assessment feedback will take place during tutorial interaction as the students’ understanding of integrated projects evolve and progress. A central ethos of the module is interactive and participative.


Penalties for late submission:

The below information applies to?all full time and flexible modular?students on taught PGT programmes in SBE.Ìý





The Support Centres will apply the following penalties for work submitted late:Ìý




  • where the piece of work is submitted after the original deadline (or any formally agreed extension to the deadline): 10% of the total marks available for that piece of work will be deducted from the mark for each working day (or part thereof) following the deadline up to a total of five working days;Ìý

  • where the piece of work is submitted more than five working days after the original deadline (or any formally agreed extension to the deadline): a mark of zero will be recorded.Ìý



ÌýThe University policy statement on penalties for late submission?which applies to all full time and flexible modular PGT students in SBE?can be found at:?/cqsd/-/media/project/functions/cqsd/documents/cqsd-old-site-documents/penaltiesforlatesubmission.pdfÌý



You are strongly advised to ensure that coursework is submitted by the relevant deadline. You should note that it is advisable to submit work in an unfinished state rather than to fail to submit any work.Ìý


Assessment requirements for a pass:

A mark of 50% overall.


Reassessment arrangements:

Resubmission of coursework


Additional Costs (specified where applicable):

1) Required text books:Ìý None

2) Specialist equipment or materials:Ìý None

3) Specialist clothing, footwear or headgear:Ìý £50

4) Printing and binding:Ìý None

5) Computers and devices with a particular specification:Ìý None

6) Travel, accommodation and subsistence:Ìý None


Last updated: 27 July 2023

THE INFORMATION CONTAINED IN THIS MODULE DESCRIPTION DOES NOT FORM ANY PART OF A STUDENT'S CONTRACT.

Things to do now