ºÚ¹Ï³ÔÁÏÍø

Internal

CE2QCT - Introduction to Quantification and Computerised Taking Off

ºÚ¹Ï³ÔÁÏÍø

CE2QCT-Introduction to Quantification and Computerised Taking Off

Module Provider: School of Construction Management and Engineering, School of Built Environment
Number of credits: 10 [5 ECTS credits]
Level:5
Terms in which taught: Spring term module
Pre-requisites: CE1CCT Construction Technology
Non-modular pre-requisites:
Co-requisites:
Modules excluded:
Current from: 2019/0

Module Convenor: Dr Lawrence Mbugua

Email: l.mbugua@reading.ac.uk

Type of module:

Summary module description:

The content of the module iscovers the principles and techniques of quantification of construction work and how these techniques may be carried out using computer technology.


Aims:

• To give a basic, initial skill in the fundamental techniques whichthat underpin the techniques of quantification of construction work,; that is, the mensuration, definition and quantification of items of construction work for the purposes of early stage estimates of cost and preparation of contract documentation.

• To provide a knowledge and understanding of ITsoftware applications used for the techniques in the above aim and to give practical experience in the use of the technology.


Assessable learning outcomes:


  • demonstrate knowledge of the various principles, techniques and standard methods of measurement and the practices of quantification, definition and costing of construction works

  • Apply the understanding of how these are appropriately used at different stages of the construction process and in different circumstances.

  • Undertake simple, practical examples of taking-off quantities of construction work items at appropriate level of detail, using traditional dim paper as well as with a computer programme.

  • Know the key sources of cost information relating to the measurement and specification of building work

  • Understand the production of bills of quantities and other tender documentation

  • Knowledge and understanding of the present and potential applications of IT methods in quantification and costing of construction works.

  • Solve problems and make decisions

  • Learn effectively and independently;


Additional outcomes:

Outline content:

• Mensuration related to construction work.

• Taking off techniques and standard booking methods.

• Standard method of measurement and taking off.

• Use and application of CostX or othersimilar computer programmes.


Brief description of teaching and learning methods:

Lectures will be given on key points and principles of the module subject matter. The lectures will be supplemented with hands-on workshops, exercises and discursive seminars. The techniques will be covered by the setting of individual practical task project work. The exercises projects will be simple material to enable the students to demonstrate enable an understanding and application of the principles of the techniques taught.



Students will be given practical sessions in the PC LabÌý


Contact hours:
Ìý Autumn Spring Summer
Lectures 20
Practicals classes and workshops 10
Guided independent study: 70
Ìý Ìý Ìý Ìý
Total hours by term 100
Ìý Ìý Ìý Ìý
Total hours for module 100

Summative Assessment Methods:
Method Percentage
Written assignment including essay 80
Class test administered by School 20

Summative assessment- Examinations:

Summative assessment- Coursework and in-class tests:

Formative assessment methods:

A computer-based (online) test will contribute 20% of the overall assessment and a written assignment will contribute 80% of the overall assessment.Ìý


Penalties for late submission:
The Module Convener will apply the following penalties for work submitted late:

  • where the piece of work is submitted after the original deadline (or any formally agreed extension to the deadline): 10% of the total marks available for that piece of work will be deducted from the mark for each working day[1] (or part thereof) following the deadline up to a total of five working days;
  • where the piece of work is submitted more than five working days after the original deadline (or any formally agreed extension to the deadline): a mark of zero will be recorded.

  • The University policy statement on penalties for late submission can be found at:
    You are strongly advised to ensure that coursework is submitted by the relevant deadline. You should note that it is advisable to submit work in an unfinished state rather than to fail to submit any work.

    Assessment requirements for a pass:
    40%

    Reassessment arrangements:
    Re-submission of assignment

    Additional Costs (specified where applicable):
    1) Required text books:
    2) Specialist equipment or materials:
    3) Specialist clothing, footwear or headgear:
    4) Printing and binding:
    5) Computers and devices with a particular specification:
    6) Travel, accommodation and subsistence:

    Last updated: 8 April 2019

    THE INFORMATION CONTAINED IN THIS MODULE DESCRIPTION DOES NOT FORM ANY PART OF A STUDENT'S CONTRACT.

    Things to do now